Update project schedule Marriott - New York Empire State / 2018 03 month



I have the honor of mica updates to your Marriott Hotel project at the New York University (many). Have been completed in the mining work, so vertical construction has already begun, other staff in the field, the daily average of 35 people.

At present, there have been 1 million 50 thousand yuan, the construction work, to buy land, creating about 160 jobs Lightstone estimation

- important landmarks

Have been completed or will be completed in mid-March 2018:

The concrete structure provided in progress.

Not listed - is an important part of the concrete structure has been installed, to help consolidate the foundation of the foundation and prevent the collapse of buildings. In the structure of moving up and down, possibly following damage from the ground or the basement of the building.

The underground pipeline system is built.

In the concrete does not flow to the north and south of the work.

- not covered part of a concrete floor of the basement was down 90%.

Don't start the wet water and solid deposit - bar reinforced concrete construction assembly and construction (steel bar) to enhance and maintain support concrete compression.

The work system is not coordinated, power supply system and water - start process coordination are to ensure that all design requirements are in line with the management mechanism of New York city building.